SDDCTEA
Department of Defense
DOD
US Army
U.S. ARMY
US Transcom
USTRANSCOM
SDDC
SDDC
 
 
header header
Home
header header
About Us
header header
Functions
header header
Tools & Initiatives
header header
Publications & Studies
header header
Data
header
header
header
header header header header
 
| |
header
header header header header
header
Click Here for Access to Restricted Areas Request access to restricted publications

Deployability Engineering
Click icon at right for access to restricted publications.

Non-Restricted Publications

Transportability and Deployability Analyses

File Name   Title   Date   Size (KB)
3000 GPH ROWPU Mat Rel.pdf   Materiel Release for KECO Industries’ 3,000 GPH Reverse Osmosis Water Purification Unit (ROWPU)   Oct 1995   34
3kWTQG.pdf   Final Transportability Engineering Analysis and Approval for the 3kW Tactical Quiet Generator (TQG) (TR 87-4s-18)   Sep 2000   30
6KFrontSideLoadingForklift.pdf   Final Transportability (TR) Engineering Analysis and Approval for the 6,000 Pound Front/Side Loading Forklift (6k FSLFL), M415 (TR 91-4v-23)   Dec 1996   141
920kWFeb03.pdf   Transportability Approval of the Deployable Power Generation and Distribution System (DPGDS), DED 920kW Power Unit, MEP–810B (DP 01-17)   Feb 2003   170
a3-appv3.pdf   Final Transportability (TR) Approval for the Bradley M2A3/M3A3   Sep 1996   73
ADCP.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Air Defense Communications Platform (ADCP) (DP 95-4e-54)   Oct 1996   162
AGEAug02.pdf   Transportability (TR) Approval for the AN/ARM-XXX Prototype Auxiliary Ground Equipment (AGE), DP 02-14   Aug 2002   52
ah64dfin2.pdf   Transportability Approval (TR) for the Longbow Apache Attack Helicopter, AH-64D. (TR 92-4a-59)   Feb 2006   79
AHFEWS.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Army High Frequency Electronic Warfare System (AHFEWS), AN/TLQ-33 (TR 91-4s-61)   Apr 1995   68
AN TSM-211 PATRIOT.pdf   Transportability Approval for the AN/TSM-211   Jul 2000   23
AN-TSQ-171.pdf   Transportability Assessment Report (AN/TSQ-171)   Apr 1998   24
AN-TTC-39E(V)1.pdf   Transportability (TR) Approval for the AN/TTC-39E(V)1 (DP 00-07)   Jul 2000   42
an-tyq-103 ACT-E full materiel release.pdf   Concurrence with Full Materiel Release for the AN/TYQ-103 (ACT-E)   Mar 2003   34
ASPARCS T-Analysis.pdf   Surface Transportability Approval for the AN/TSQ-230 Tactical Terminal Control Subsystem - Air Surveillance and Precision Approach Radar Control System (ASPARCS) Operational Subsystem/Communications Subsystem (OS/CS) and Pallet HMMWVs (DP 04-10)   Jul 2004   143
ASV M1117 19 Oct 98.pdf   Final Transportability Engineering Analysis and Approval for the M1117 Armored Security Vehicle (ASV), (DP 95-4e-19)   Oct 1998   29
atec_tr.pdf   Transportability Approval for the M1114 Armored Expanded Capacity Vehicle (ECV) (94-4V-52)   May 2002   756
ATNAVICS_May01.pdf   Transportability Approval for the Air Traffic Navigation, Integration and Coordination System (ATNAVICS), AN/TPN-31 (DP 01-08)   May 2001   174
BFIST T-Approval.pdf   Final Transportability Engineering Analysis and Approval for the M7 Bradley Fire Support (BFIST) System, DP 98-4e-01   Sep 1997   48
BFISTT.pdf   Final Transportability Engineering Analysis and Approval for the M7 Bradley Fire Support (BFIST) System, DP 98-4e-01   Oct 1998   48
BIDS M31E1.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Biological Integrated Detection System, M31E1 (P3I BIDS) (TR 93-4a-54)   Nov 1997   29
BTOC (PATRIOT).pdf   Transportability Approval for the Battalion Tactical Operations Center (BTOC)   May 1996   28
CALSET2000Approval.pdf   Transportability Approval for the Calibration Set 2000 (CALSET 2000) (DP02-08)   Sep 2002   79
CBL T-Analysis.pdf   Transportability Approval for the Force Provider (FP) Containerized Batch Laundry   Sep 1996   43
CBPS Transportability Approval.pdf   Final Transportability Engineering Analysis and Approval for the Chemically and Biologically Protected Shelter System (CBPSS).   Nov 2001   50
CBT.pdf   Final Transportability (TR) Approval for the Common Bridge Transporter (CBT) (DP 96-4e-03).   Apr 1998   116
CBTEnclosure1.pdf   CBT Enclosure 1   Apr 1998   1350
CBTSystemData.pdf   CBT System Data   Apr 1998   672
CMTH T-Approval.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Contact Maintenance Test HMMWV (CMTH) (DP 95-4e-38)   Mar 1996   48
CONDOR (USMC) T- Analysis.pdf   Preliminary Surface Transportability Assessment for the Command and Control (C2) On-The-Move (OTM) Network, Digital Over-The-Horizon (OTH) Relay (CONDOR) Gateway (GW) AN/VSC-XXX (DP 06-02)   Nov 2005   205
Containerized Kitchen CK T-Approval 31 Jul 98.pdf   Final Transportability Engineering Analysis and Approval for the Containerized Kitchen (CK) (DP 96-4e-31)   Jul 1998   112
d7h&r_tr.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Caterpillar D7H and D7R Bulldozer (dozer)   Nov 1997   108
DEUCEAPPROVAL.pdf   Request for Full Materiel Release and Type Classification Standard for Deployable Universal Combat Earthmover (DEUCE)   Jun 1999   31
DTSS-L Approval.pdf   Final Transportability (TR) Approval for the Digital Topographic Support System / Quick Response Multicolored Printer - Light (DTSS-L) (TR 86-4a-16).   Sep 1998   42
ECV-T.pdf   Transportability Approval for the M1113 Expanded Capacity Vehicle (ECV) (94-4V-52)   May 2002   33
EOD Transportability Approval.pdf   Transportability (TR) Approval for the Explosive Ordnance Disposal (EOD) (DP 00-09)   Jul 2001   42
EPP III (PATRIOT).pdf   Transportability Approval for the Electric Power Plant III (EPP III)   Mar 1999   38
ers-t.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Electronics Repair Shelter (ERS) (DP 97-4e-35)   May 1997   36
EVANFIN.pdf   Final Transportability Engineering Analysis and Approval for the Standardized Integrated Command Post System (SICPS) 5 ton Expansible Van (EVAN) Installation Kit (IK), MK-2780/G   Feb 2006   39
FCS Milestone B Assessment Update.pdf   Transportability Assessment Update of the Future Combat Systems (FCS) Manned Ground Vehicles (MGVs) (DP 00-18)   Mar 2006   2657
FCS Milestone B Assessment.pdf   Transportability Assessment of the Future Combat Systems (FCS) for Milestone B (DP 00-18)   Apr 2003   215
FMTVA1Approval.pdf   Transportability Approval and Materiel Release for the FMTVA1 Series Vehicles   Apr 2000   41
FMTVTRAILERApproval.pdf   Transportability Approval and Materiel Release for the FMTV Series Trailers   Dec 2000   58
FRS-HApproval.pdf   Transportability Approval and Materiel Release for the Forward Repair System (FRS)   Jun 2000   28
GANGApproval.pdf   Transportability Approval and Materiel Release for the Generic Aircraft Nitrogen Generator (GANG)   Nov 2000   29
GRF_ Approval.pdf   Transportability Approval (TR) for the Ground Relay Facility (GRF) (DP01-10)   JUL 2001   199
Guardrail Common Sensor AN MSQ-130 4 Sep 02.pdf   Transportability Approval (TR) for the Guardrail Common Sensor (GR/CS) – 3.8 Meter SATCOM Terminal, AN/MSQ-130 (DP02-04)   Sep 2002   468
Guardrail-AN_USD-9E_CS2-Feb99.pdf   Final Transportability Engineering Analysis and Approval for the AN/USD-9E Guardrail/Common Sensor System 2 (GR/CS 2)   Feb 1999   59
GuardRail-CSFeb99.pdf   Final Transportability Engineering Analysis and Approval for the AN/USD-9E Guardrail/Common Sensor System 2 (GR/CS 2)   Feb 1999   46
HCLOS Transportability Approval.pdf   Transportability (TR) Approval for the AN/TRC-190C Shelter Assemblages on the M1097 HMWWV and Nodal Support Vehicle (NSV), High Capacity Line of Sight (HCLOS) Program (DP 00-08)   Jun 2000   150
HEMTT-LHSApproval.pdf   Transportability Approval and Materiel Release for the HEMTT-Load Handling System   Jun 2000   32
HIMARS MS C Support.pdf   Transportability Concurrence with the Milestone C Decision for the High Mobility Artillery Rocket System (HIMARS)   Feb 2003   79
HMDA T-Approval.pdf   Transportability Approval Extension and Materiel Release for the High Mobility Digital Group Multiplexer (DGM) Assemblage (HMDA) (DP 99-04)   Oct 1998   23
HMDA-T.pdf   Transportability Approval Extension and Materiel Release for the High Mobility Digital Group Multiplexer (DGM) Assemblage (HMDA) (DP 99-04)   Oct 1998   23
HMDDASC Approval.pdf   Transportability Approval for the USMC High Mobility Downsized Direct Air Support Central (HMD DASC)   Feb 2006   30
HMT ANALYSIS.pdf   Final Transportability (TR) Engineering Analysis and Approval for the M1101 and M1102 High Mobility Trailers (HMTs) (TR 90-4v-16)   Feb 1997   234
HSC2FIN.pdf   Final Transportability Engineering Analysis and Approval, and Concurrence with Type Classification Standard and Materiel Release for the High Speed Compactor (HSC).   Feb 2006   44
Hunter-UAV.pdf   Transportability (TR) Approval for the Joint Tactical Unmanned Aerial Vehicle (JTUAV), “Hunter” (TR 89-4a-13)   Jul 1996   68
IHMEE full materiel release.pdf   Concurrence with Full Materiel Release and Type Classification Standard for the Interim High Mobility Engineer Excavator (IHMEE)   May 2003   23
ISYSCON (ECV & HMT) T-Approval 8-02.pdf   Transportability (TR) Approval and Materiel Release Extension for Integrated System Control (ISYSCON) and Network Management Tool (NMT) Shelter System (DP 96-4e-32)   Aug 2002   282
ISYSCON T-Approval.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Integrated System Control (ISYSCON) and Network Management Tool (NMT) Shelter System (DP 96-4e-32)   Dec 1996   40
ISYSCON-T.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Integrated System Control (ISYSCON) and Network Management Tool (NMT) Shelter System   Dec 1996   35
LADS.pdf   Transportability (TR) Approval for the Laundry Advanced System (LADS)   Sep 1998   41
LAV MEWSS 30 Sep 97.pdf   Final Transportability Engineering Analysis for the Light Armored Vehicle Mobile Electronic Warfare Support System (LAV-MEWSS) (DP 97-4e-41)   Sep 1997   25
LAV NGB PC 3 Oct 96.pdf   Final Transportability Engineering Analysis for the Light Armored Vehicle National Guard Bureau Personnel Carrier (LAV-NGBPC) (DP 95-4e-57)   Oct 1996   30
LDTOC T-Assessment.pdf   Transportability Assessment of the Light Digital Tactical Operations Center (LDTOC) Advanced Concept Technology Demonstrator (ACTD) (DP 98-4e-22)   Jun 1998   360
LHXGA.pdf   Final Transportability Analysis and Approval of the Lightweight High-Gain X-Band Antenna (LHGXA)   Jan 1998   33
LHXGAappr.pdf   Final Transportability Analysis and Approval of the Lightweight High-Gain X-Band Antenna (LHGXA).   Jan 1998   33
LogVehSys-Aug97.pdf   Final Transportability Engineering Analysis and Approval for the Logistics Vehicle System (LVS) (DP 95-4e-17)   Aug 1997   28
LSVR_ATC-Nov04.pdf   Draft Surface Transportability Assessment for the U.S. Marine Corps Logistics Vehicle System Replacement (LVSR), American Truck Company (DP 05-01)   Nov 2004   113
LSVR_OTC-Nov04.pdf   Surface Transportability Assessment for the U.S. Marine Corps Logistics Vehicle System Replacement (LVSR), Oshkosh Truck Corporation (DP 05-01)   Nov 2004   75
LTT Approval.pdf   Transportability Approval Update for the M1101 and M1102 Light Tactical Trailers (LTT) (TR 90-4v-16)   Apr 2005   33
M082 Asphalt Melter Final 25 Oct 95.pdf   Updated Final Transportability (TR) Engineering Analysis and Approval for the Melter, Asphalt, Skid Mounted, 750 GPH, Hot Oil Circulation, M082 (DP 95-4e-34)   Oct 1995   42
M1 flatrack FINAL.pdf   Final Transportability Engineering Analysis and Transportability (TR) Approval, and Concurrence with Full Materiel Release for the M1 International Organization for Standardization (ISO) Compatible Palletized Load System (PLS) Flatrack (TR 86-4v-23).   Aug 1996   65
M2A3-M3A3appv.pdf   Final Transportability (TR) Approval for the Bradley M2A3/M3A3   Sep 1996   73
M902 LAUNCHER (PATRIOT).pdf   Transportability Approval for the PATRIOT Advanced Capability-Phase 3 (PAC-3) Configuration 3 Launching Station, Semitrailer Mounted, M902   Mar 1998   46
M902 updateJune02.pdf   Transportability Approval for the PATRIOT Advanced Capability-Phase 3 (PAC-3) Configuration 3 Launching Station, Semitrailer Mounted, M902   Jun 2002   58
M902_LAUNCHER_PATRIOT.pdf   Transportability Approval for the PATRIOT Advanced Capability-Phase 3 (PAC-3) Configuration 3 Launching Station, Semitrailer Mounted, M902   Mar 1998   33
M916A2 Truck Tractor 15 Nov 96.pdf   Final Transportability Engineering Analysis and Approval for the M916A2 Truck Tractor (DP 95-4e-10)   Feb 2006   30
M917A1 Dump Truck 18 Nov 97.pdf   Final Transportability Engineering Analysis and Approval for the M917A1 Dump Truck (TR 94-4v-35)   Nov 1997   31
M969A2 Final.pdf   Final Transportability Engineering Analysis and Approval for the M969A2, Semitrailer, Tank, 5,000 Gallon, Automotive Service. (TR 88-4v-03)   Feb 2006   32
M969A2 Finalrev.pdf   Updated Final Transportability Approval for the M969A2, Semitrailer, Tank, 5,000 Gallon, Automotive Service. (TR 88-4v-03)   Feb 2006   28
M989A1HApproval.pdf   Transportability Approval and Materiel Release for the Heavy Expanded Mobility Ammunition Trailer (HEMAT)   Jun 2000   29
MEADS Milestone B Approval.pdf   Transportability Concurrence for the Combined Aggregate Program (CAP) Milestone B Decision (DP 91-4a-47)   May 2004   34
MEF IAS Final.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Marine Expeditionary Force Intelligence Analysis System (MEF IAS), AN/MYQ-7 and the Technical Control and Analysis Center Product Improvement Program (TCAC PIP), AN/MYQ-8. (DP 95-4e-41)   May 1998   38
MEF IAS.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Marine Expeditionary Force Intelligence Analysis System (MEF IAS), AN/MYQ-7. (DP 95-4e-41)   Feb 1996   40
MEP-810B Deployable Power Generation.pdf   Transportability Approval of the Deployable Power Generation and Distribution System (DPGDS), DED 920kW Power Unit, MEP–810B (DP 01-17)   Feb 2003   164
MHG final.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Hydrogen Generator (HG), AN/TMQ-42 (DP 95-4e-36)   Mar 1996   35
MLRSA1APP.pdf   Transportability Approval for the M270A1 Multiple Launch Rocket System (MLRS)   Jul 1998   29
Modular Causeway Ferry MCF 14 May 97.pdf   Transportability Approval of the Modular Causeway Ferry (MCF)   May 1997   28
Modular Causeway System MCS 22 Feb 01.pdf   Final Transportability Analysis for the Modular Causeway System (MCS)   Feb 2001   849
MPKAPPROVAL.pdf   Transportability Approval for the M923A2 5-Ton Truck Mine Protection Kit,   Jan 1996   28
MVES.pdf   Transportability (TR) Approval for the Motion Video Editing System (MVES)   Jun 1996   27
PLS CHU final.pdf   Final Transportability Engineering Analysis and Approval, and Concurrence with Type Classification Standard and Full Materiel Release for the Palletized Load System (PLS) Container Handling Unit (CHU).   Aug 1999   71
PLS CROP final1.pdf   Final Transportability Engineering Analysis and Approval, and Concurrence with Type Classification Standard and Full Materiel Release for the Palletized Load System (PLS) M3 (Summa) and M3A1 (Hyundai) Container Roll-in/Roll-out Platform (CROP).   Jun 1999   65
PLS EMMs final.pdf   Final Transportability Engineering Analysis and Approval, and Concurrence with Type Classification Standard and Full Materiel Release for the Palletized Load System (PLS) Engineering Mission Modules (EMMs) (Dump Body, Concrete Mobile Mixer and Bituminous Distributor Modules)   Mar 1999   53
PROPHET 30 Aug 02.pdf   Transportability (TR) Approval for the AN/MLQ-40(V)3 PROPHET (DP 02-17)   Aug 2002   99
R033-Approval w-signature.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Vibratory Compactors, Self-Propelled, Type I and Type III (Caterpillar CS-433C) (DP 95-4e-01)   Jan 1999   140
RADAR SET III (PATRIOT).pdf   Transportability Approval for the PATRIOT PAC-3, Configuration 3 Radar Set; AN/MPQ-65   Feb 1997   37
RLCEU (PATRIOT).pdf   Transportability Approval for the PATRIOT Missile System Configuration 3 Remote Launch Communications Enhancement (RL/CEU) Program   Apr 1998   39
Roller_TR.pdf   Final Transportability (TR) Engineering Analysis for the WRT Equipment LTD. Towed Roller, PT-13 (DP 95-4e-56)   Dec 1997   113
RTCH-KalmarMay01.pdf   Final Transportability Engineering Analysis for the Rough Terrain Container Handler (RTCH) (DP 98-4e-26)   May 2001   81
SECM-Approval.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Shop Equipment, Contact Maintenance (SECM) HMMWV (DP 97-4e-36)   Nov 1998   76
Skidsteer-S150_Mar04.pdf   Transportability Approval and Materiel Release for the Compact Skid Steer Loader (CSSL), 1500-pound Capacity, Bobcat S150 (DP 04-05)   Mar 2004   166
SMART-T 26 Jun 98.pdf   Transportability Approval and Final Transportability Engineering Analysis for the Secure Mobile Anti-Jam Reliable Tactical Terminal (SMART-T)(TR 94-4v-13)   Jun 1998   29
SOMS B T-Approval.pdf   Final Transportability Engineering Analysis and Approval for the Special Operations Media System B (SOMS B) TR 94-4v-11   Feb 2006   39
SOMS-B-T.pdf   Final Transportability Engineering Analysis and Approval for the Special Operations Media System B (SOMS B) TR 94-4v-11   Oct 1999   34
SPEPS.pdf   Transportability (TR) Approval for the Still Photography Editing and Processing System (SPEPS) (DP 95-4e-47)   June 1996   27
SSS Transportability Approval.pdf   Transportability (TR) Approval for the AN/TTC-56(V)1 Central Office, Telephone, Automatic (Common Name: Single Shelter Switch (SSS)) (DP 00-01)   Nov 1999   39
Striker T-Approval.pdf   Final Transportability Engineering Analysis and Approval for the Striker System Kit M1025A2 HMMWV (DP 98-4e-15)   Jun 1998   387
Striker-T.pdf   Final Transportability Engineering Analysis and Approval for the Striker System Kit M1025A2 HMMWV (DP 98-4e-15)   Jun 1998   381
TAIS 01.pdf   Transportability (TR) Engineering Analysis and Concurrence with the Milestone C Decision for the Tactical Airspace Integration System (TAIS)   Jun 2001   122
TBPS Armored M900 Tankers.pdf   Transportability Assessment for the M900 Series 5,000-Gallon Fuel Tankers with Add-on Armor, Tanker Ballistic Protection System (TBPS)   Feb 2005   79
THAAD APPROVAL.pdf   Transportability Approval and Concurrence with the Theater High Altitude Area Defense (THAAD) Milestone II Decision   Feb 2000   31
TPS59FIN.pdf   Final Transportability Engineering Analysis and Approval for the AN/TPS-59(V)3 Radar Set.   Feb 2005   42
TQG-rebuy30-60-Feb01.pdf   Transportability Approval for the “B” Model 30 and 60kW Tactical Quiet Generator (TQG) Sets, Skid mounted sets and Power Units/Power Plants   Feb 2001   33
TrailerMountedWeldShop-Mar01.pdf   Transportability Approval for the Trailer Mounted Welding Shop Set, (DP 01-04)   Mar 2001   88
TRSS.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Tactical Remote Sensor System (TRSS) AN/MSC-77 Sensor Mobile Monitoring System (SMMS) (DP 96-4e-04)   Dec 1996   110
TSM-AN-210 T-Approval.pdf   Final Transportability Engineering Analysis and Approval of the AN/TSM-210 Transportable Electronic Shop (DP 98-4e-27)   Sep 1998   375
TTCS TR Apr.pdf   Final Transportability (TR) Engineering Analysis and Approval for the Tactical Terminal Control System (TTCS) (DP 95-4e-21)   Jul 1996   28
TUAV MSIII.pdf   Transportability of the Tactical Unmanned Aerial Vehicle (TUAV) System for the Milestone III Decision   May 2002   269
UH-60Q final (no MFR).pdf   Final Transportability Approval and Concurrence with Full Materiel Release of the UH-60Q Helicopter.   Mar 2000   121
Water Trailer XM1112 Approval.pdf   Final Transportability (TR) Engineering Analysis and Approval for the XM1112 Water Trailer   Apr 1999   228

Restricted Publications


If you would like a copy of an approval for a new system or an updated system not listed/provided above or you are not sure an approval has been developed for a system please send your request to:usarmy.scott.sddc.mbx.tea-dpe@mail.mil

header   © Copyright SDDCTEA 2009. This page last modified on 22 May, 2013. header
Everything on this page is UNCLASSIFIED unless otherwise marked.
Home | About Us | Functions | Tools & Initiatives | Publications & Studies | Data